Skip to content

Atom Robot | User Manual

This page aggregates usage notes and cautions for the Atom series.

1. Safety & Notes

  • Before power‑on, double‑check Servo and power wiring to avoid reverse connection/shorts.
  • For the first power‑on, start with lower motion speed; verify joint directions and zero positions step by step.

2. Recommendations

  • Validate at least one motion using the Web/PC Configuration Software first, then integrate with your own controller program.
  • When adding sensors, confirm power and logic levels (3.3 V / 5 V) first.